SIERRA CLUB AIRPORT MARINA GROUP MEETING 3.15.16 with Speakers Rex Frankel and Melanie Winter

1 - SIERRA CLUB INVITE pdf 3.15.16.pdf

Please join Sierra Club Airport Marina Group
Burton Chace Park, 13650 Mindanao Way, Marina del Rey
Tuesday, March 15th from 7 pm to 9:00 pm
.  

Two well known and respected speakers will share Ideas on Rainwater Capture, Cleanup, Reuse & Much More . . . 

YouTube: How To Use A Catchment Basin To Eliminate Ponding And To Save Precious Rain Water on an Industrial Property.

https://youtu.be/kLVqSvcv8eA

During heavy rains, our industrial parking lot would have six inch puddles. Our cement contractor, De Olivera Concrete removed approximately 1,000 feet of concrete, dug a 8 by 8 by 8 foot deep Catchment Basin, filled it with gravel, and installed a steel grate so rainwater could percolate back into the earth. This win, win situation helped the tenant and put much need rainwater back into our aquifer. 
 

Pages